PAPAN Project Assignment Abuyung • Water & Facility Infrastructure

Infrastructure development supporting the Abuyung water system and PHCC facilities.

PAPAN supports infrastructure projects through civil works, structural components, elevated storage, distribution systems and facility-support works.

Integrated Abuyung Work Components

Civil, storage, distribution and facility-support components delivered as one assignment.

Storage units, waiting areas and service facilities at Abuyung PHCC
Abuyung PHCC Abuyung Assignment Component

PHCC Support Structures

Construction and monitoring covered storage units, waiting areas and service facilities within Abuyung PHCC.

Storage units Waiting areas Service facilities
View related case study
Six-metre elevated tank stand with two 5000-litre tanks
Abuyung Abuyung Assignment Component

Six-Metre Elevated Tank Stand

The structure carries two 5,000-litre tanks and provides 10,000 litres of elevated storage before discharge to the tap stands.

6m stand 2 × 5,000L tanks 10,000L storage
Read the Abuyung case study
Four-tap collection points at Abuyung Trading Centre and PHCC
Trading Centre & PHCC Abuyung Assignment Component

Four-Tap Collection Points

Multi-point tap stands were installed at Abuyung Trading Centre and PHCC to improve access and shorten queues during water collection.

Four taps per stand Trading Centre PHCC
View the distribution record
Pipe distribution connecting storage and community collection points
Abuyung Distribution Network Abuyung Assignment Component

Pipe Distribution Connections

Pipework connected the pumping system, elevated tanks and community collection points across Abuyung Trading Centre and PHCC.

Pumping connection Elevated storage Tap-stand supply
Review Civil, Water & WASH Projects
Office-space assessment for a mini water-quality laboratory
Facility Assessment Technical Facility Assessment

Mini Laboratory Space Assessment

Office space and existing facilities were reviewed for establishing a mini laboratory for water-quality testing.

Office-space review Water testing Facility suitability
Infrastructure development services by PAPAN South Sudan Ltd
Infrastructure Development

Discuss a civil, structural or facility-support assignment.

Share the site location, drawings or concept, present condition, required output and any access, utility or operating constraints.

Related PAPAN Capability

Infrastructure experience supporting water, power and technical review.

The Abuyung experience shows how structural works, distribution infrastructure, monitoring and facility requirements were coordinated.