PAPAN supported assessment, monitoring and field verification for rehabilitation work on existing borehole systems serving communities in Yirol East.
Why rehabilitation begins with assessment
A borehole may remain physically present while providing an unreliable service. The cause may be a pump fault, a worn rising main, damaged civil works, poor drainage, repeated temporary repairs or weak maintenance arrangements. An assessment helps separate these issues before money is committed to the wrong intervention.
What should be reviewed
The review of an existing borehole should consider the pump and lifting arrangement, rising main, apron, drainage, headworks, source history, earlier repairs and any available yield or water-quality records. The condition around the borehole also matters because standing water, erosion or damaged drainage can create safety and hygiene problems even when pumping has resumed.
PAPAN’s role in the assignment
PAPAN supported assessment, monitoring and field verification under its defined project role. The focus was on existing borehole systems and the rehabilitation activities required to restore more dependable functionality. Monitoring helped connect the condition observed before repair with the work completed and the service expected afterward.
Community service context
The associated project record reports service to more than 4,300 people across 717 households. At that scale, downtime affects household routines, collection distances and pressure on alternative sources. This is why functionality should be judged by the service experienced by users, not only by whether a pump can temporarily produce water.
Protecting the restored service
Rehabilitation should be followed by preventive maintenance, a clear operator role, early fault reporting and realistic access to spare parts. Communities and responsible institutions also need to know who receives fault reports and who can authorise repairs. Without that arrangement, small defects can develop into another prolonged interruption.
The complete project record
The Yirol East case study provides the documented background, service context and PAPAN contribution for readers reviewing project experience or capability evidence.
Publication information
Publication: PAPAN Insights
Publisher: PAPAN South Sudan Ltd
Editorial byline: PAPAN Insights Editorial Team
Technical review: PAPAN Technical Team
Published: 26 July 2026
Corrections and enquiries: info@papangroup.com